01
Project Setup
Enter project details — location, area, ceiling height, duration, finishing level.
02
Demolition
Specify walls demolished — drywall vs masonry ratio, disposal method.
03
Materials & Finishes
Flooring, wall finishes, ceiling, plumbing, sanitary fixtures — each with component-level breakdown.
04
Systems
Electrical, HVAC (with EPD composition), appliances (EPA data), site energy consumption.
05
Furniture
Individual pieces with weight and 8-material composition. New or reuse.
06
Transport
Multi-modal delivery mix — van, truck, rail, ship, air — with distance tiers.
07
Results
Full breakdown by category, scope, and material. Audit trail with every calculation step.